IBM Switch 15 Manuale Utente Pagina 103

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 270
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 102
93
Building Streams
Step 3: Replace the template source node.
Using the Data Mapping option o n the pop-up menu
for the templa
te source node, click Select Replacement Node, then select the source node for
the replacement data.
Figure 5-45
Selecting a r
eplacement source node
Step 4: Check mapped fields.
In the dialog box that opens, c heck that the softw are is mapping elds
properly
from the replacement data source to the stream. Any unmapped essential elds are
display ed in r ed. These elds are used in stream operations and must be replaced with a sim ilar
eld in the new data source in order for downstream operations to function properly. For more
informa t
ion, see the topic Examin ing Mapped F ields on p. 95.
After usin g the dialog box to ensure that all essential elds are properly mapped, the old data
source is disconnected and the new data source is conne cted to the stream using a Filter node
called Ma
p. This Filter node directs the actual mapp ing of elds in t he stream. An Unmap Filter
node is also included on the stream canvas. The Unmap Filter node can b e used to reverse eld
name mapping by adding it to the stream. It will undo the mapped elds, but note t hat you will
have to e
dit any downstream terminal nodes to r eselect the elds and overlays.
Figure 5-46
New data source successfully mapped to the stream
Vedere la pagina 102
1 2 ... 98 99 100 101 102 103 104 105 106 107 108 ... 269 270

Commenti su questo manuale

Nessun commento