IBM M/02-212 Manuale Utente

Navigare online o scaricare Manuale Utente per Attrezzi di misura&configurazione IBM M/02-212. IBM M/02-212 User's Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa

Sommario

Pagina 1 - BROOKFIELD R/S RHEOMETER

Brookfield Engineering Labs., Inc. Page 1 M/02-212 BROOKFIELD R/S RHEOMETER Operating Instructions Manual No. M/02-212

Pagina 2

Brookfield Engineering Labs., Inc. Page 10 M/02-212 III.2 Electrical Connections Connections for the electrical components of the R/S Rheomete

Pagina 3

Brookfield Engineering Labs., Inc. Page 11 M/02-212 III.2.2 AC-Adaptor The AC adaptor supplies R/S Rheometer with power. Only the AC-adaptor

Pagina 4 - APPENDIX

Brookfield Engineering Labs., Inc. Page 12 M/02-212 Please read information concerning installation of the computer system in this Operation Ma

Pagina 5 - I. General Description

Brookfield Engineering Labs., Inc. Page 13 M/02-212 OKSTPowerMain-Menue - Run Single - Run Program - RemoteBROOKFIELDCooling device KETemperatu

Pagina 6 - II. System Configuration

Brookfield Engineering Labs., Inc. Page 14 M/02-212 -20 °C to +250 °C thermostat oil Thermostatic fluids can be ordered from BROOKFIELD. Dur

Pagina 7

Brookfield Engineering Labs., Inc. Page 15 M/02-212 During measurements in the temperature range below -10°C and above +90°C the measuring de

Pagina 8 - II.3 Computer System

Brookfield Engineering Labs., Inc. Page 16 M/02-212 Measuring device for cone/plate and plate/plate measuring systems ME CC/CP

Pagina 9 - III. Instrument Installation

Brookfield Engineering Labs., Inc. Page 17 M/02-212 III.3.3 Mounting of the cooling device KE The optionally supplied cooling device “KE” m

Pagina 10 - III.2 Electrical Connections

Brookfield Engineering Labs., Inc. Page 18 M/02-212 IV. Environment, handling, cleaning and maintenance In this chapter you get information c

Pagina 11 - III.2.2 AC-Adaptor

Brookfield Engineering Labs., Inc. Page 19 M/02-212 Check that any liquid does not penetrate into the housing (e.g. through the instrument con

Pagina 12

Brookfield Engineering Labs., Inc. Page 2 M/02-212 Operating Manual for R/S Rheometer Version 1.10 E, valid for firmware version 4.02 All ri

Pagina 13 - BROOKFIELD

Brookfield Engineering Labs., Inc. Page 20 M/02-212 V. Measuring Systems In this chapter you get information concerning use of the measuring s

Pagina 14

Brookfield Engineering Labs., Inc. Page 21 M/02-212 Insert carefully the measuring bob into the measuring bob coupling. Pay attention to insert

Pagina 15

Brookfield Engineering Labs., Inc. Page 22 M/02-212 Temperature range max.: 0°C ... +90°C. The cooling device “KE” is required to expand the t

Pagina 16

Brookfield Engineering Labs., Inc. Page 23 M/02-212 To remove the measuring system after the measurement first open the measuring bob coupling

Pagina 17

Brookfield Engineering Labs., Inc. Page 24 M/02-212 In order to avoid thread backlash, the height adjustment ring must be now obligatory turn t

Pagina 18 - IV.3 Cleaning

Brookfield Engineering Labs., Inc. Page 25 M/02-212 VI. Operation and Menue System In the following chapter you will get overview on operatio

Pagina 19 - IV.4 Maintenance

Brookfield Engineering Labs., Inc. Page 26 M/02-212 VI.1 Keyboard STBROOKFIELDOKSTART/STOP- back to parent menue- break- start of measurement

Pagina 20 - V. Measuring Systems

Brookfield Engineering Labs., Inc. Page 27 M/02-212 Key-function dependent to executed operation key operation Function of key example

Pagina 21

Brookfield Engineering Labs., Inc. Page 28 M/02-212 VI.2 Menu System of R/S Rheometer T

Pagina 22

Brookfield Engineering Labs., Inc. Page 29 M/02-212 Menu handling Because LCD display of R/S Rheometer cannot show simultaneously all menue i

Pagina 23 - Scale fixing screw

Brookfield Engineering Labs., Inc. Page 3 M/02-212 CONTENTS I. GENERAL DESCRIPTION 5 I.1 Use of the Rheometer 5 I.2 Measuring Princ

Pagina 24

Brookfield Engineering Labs., Inc. Page 30 M/02-212 • Selection of a program or a measuring system you want to edit in “Edit Program” and “Mea

Pagina 25

Brookfield Engineering Labs., Inc. Page 31 M/02-212 Using and keys you can move cursor leftwards (rightwards). To process the nex

Pagina 26 - VI.1 Keyboard

Brookfield Engineering Labs., Inc. Page 32 M/02-212 VI.5 Menue entries (MAIN menue) Menue entries (see Menue System in Chapter 6.2) may eit

Pagina 27

Brookfield Engineering Labs., Inc. Page 33 M/02-212 At this point you either can start a measurement by pressing key, or return back t

Pagina 28

Brookfield Engineering Labs., Inc. Page 34 M/02-212 After measurement, or after a break, the display field for Step indicates “END” or “BREA

Pagina 29 - VI.3 Selecting from Lists

Brookfield Engineering Labs., Inc. Page 35 M/02-212 If you have passed these points, before starting a measurement, the Rheometer will indicate

Pagina 30

Brookfield Engineering Labs., Inc. Page 36 M/02-212 After measurement, or after a break, the display field for Step indicates “END” or “BREAK”.

Pagina 31 - Alphanumeric inputs

Brookfield Engineering Labs., Inc. Page 37 M/02-212 VI.6 Menue entries in the Utilities-Menue Utilities menue, as its title presumes, conta

Pagina 32

Brookfield Engineering Labs., Inc. Page 38 M/02-212 • measuring system to be used in the measurement • Number of steps • start and end valu

Pagina 33

Brookfield Engineering Labs., Inc. Page 39 M/02-212 All free memory parts are marked as NEW. In order to avoid overwriting of already a

Pagina 34

Brookfield Engineering Labs., Inc. Page 4 M/02-212 VI.7 Menu entries of the CONFIGURATION menu 44 VI.7.1 Configuration → Set output mode

Pagina 35

Brookfield Engineering Labs., Inc. Page 40 M/02-212 For every step, there are the following inputs: Input Step Nr 1 Start[1/s]: 0010.00 End[

Pagina 36 - VI.5.3 MAIN menue → Remote

Brookfield Engineering Labs., Inc. Page 41 M/02-212 Saving of the Program: If you push key now, the Program will be saved. If you pu

Pagina 37

Brookfield Engineering Labs., Inc. Page 42 M/02-212 After selection of the measuring system, you will be requested to input sequentially: its

Pagina 38 - D[1/s]=f(t)

Brookfield Engineering Labs., Inc. Page 43 M/02-212 If you have chosen the output device, you have to select the measuring series to transfer

Pagina 39

Brookfield Engineering Labs., Inc. Page 44 M/02-212 VI.7 Menu entries of the CONFIGURATION menu The Entries: • Set output-mode sets output

Pagina 40

Brookfield Engineering Labs., Inc. Page 45 M/02-212 b) for output to the serial interface (RS232), the receiving device (normally a PC) is set

Pagina 41

Brookfield Engineering Labs., Inc. Page 46 M/02-212 After setting time and date you will be requested if you want to set clock for new time.

Pagina 42

Brookfield Engineering Labs., Inc. Page 47 M/02-212 • Stopbits [Bit]: 1 or 2 Choose the requested parameter from the list of available v

Pagina 43 - MEASCOUNT

Brookfield Engineering Labs., Inc. Page 48 M/02-212 3. The receiver is ready for reception and can (due to sufficient PC and memory capacity)

Pagina 44

Brookfield Engineering Labs., Inc. Page 49 M/02-212 14. Start measurement at the Rheometer. Measurement points must now be seen as text at

Pagina 45

Brookfield Engineering Labs., Inc. Page 5 M/02-212 I. General Description In this chapter you get general information concerning use and mea

Pagina 46

Brookfield Engineering Labs., Inc. Page 50 M/02-212 VII. Measurements VII.1 Measuring in manual mode To carry out measurements in manual mo

Pagina 47

Brookfield Engineering Labs., Inc. Page 51 M/02-212 Point to the fact that any substance or solvent do not ingress into measuring bob coupling

Pagina 48

Brookfield Engineering Labs., Inc. Page 52 M/02-212 VIII. Technical data R/S Rheometer Dimensions 480 mm x 300 mm x 290 mm Weight 8 kg Nomina

Pagina 49

Brookfield Engineering Labs., Inc. Page 53 M/02-212 FTK-CC Dimensions (Width x Height x Depth) 94 mm x 55 mm x 170 mm Weight 600 g Temperat

Pagina 50 - VII. Measurements

Brookfield Engineering Labs., Inc. Page 54 M/02-212 IX. Guarantee Brookfield Engineering Laboratories guarantees the faultless functioning of

Pagina 51

Brookfield Engineering Labs., Inc. Page 55 M/02-212 APPENDIX A1 Data sheets of standard measuring systems Table Standard cylinder measuring

Pagina 52 - VIII. Technical data

Brookfield Engineering Labs., Inc. Page 56 M/02-212 Table Double Gap cylinder measuring system according to DIN 53453 (consists of measuring

Pagina 53 - 50 mNm)

Brookfield Engineering Labs., Inc. Page 57 M/02-212 Table Cone/Plate measuring systems (DIN 53018) (consists of measuring cone and measuring de

Pagina 54 - IX. Guarantee

Brookfield Engineering Labs., Inc. Page 58 M/02-212 A2 Error messages The R/S Rheometer is rather error resistive, when errors occur they are

Pagina 55

Brookfield Engineering Labs., Inc. Page 59 M/02-212 Zero Calibration Error Cause: An impermissible high value was measured during carrying ou

Pagina 56

Brookfield Engineering Labs., Inc. Page 6 M/02-212 II. System Configuration In this chapter you get information concerning system configuratio

Pagina 57

Brookfield Engineering Labs., Inc. Page 60 M/02-212 BREAK: SPEED MAX Cause: Maximum speed exceeded during carrying out a measurement. a) You

Pagina 58 - Printer Error

Brookfield Engineering Labs., Inc. Page 61 M/02-212 A3 Pin-layout of the serial data cable The Rheometer is provided with a serial interface

Pagina 59 - BREAK: MOMMAX

Brookfield Engineering Labs., Inc. Page 62 M/02-212 A4 Requirements to the mains connecting cables The AC-adaptor unit of the R/S Rheometer en

Pagina 60 - BREAK: SPEED MAX

Brookfield Engineering Labs., Inc. Page 63 M/02-212 - The mains plug must be 2-pin shockproof plug according to the Japanese Industrial Standa

Pagina 61

Brookfield Engineering Labs., Inc. Page 64 M/02-212 German menue system of RC20 HAUPT-MenueEinzel-messungProgramm-MessungHilfsmittelKonfigurati

Pagina 62

Brookfield Engineering Labs., Inc. Page 65 M/02-212 Index C cleaning, 18 computer system, 6, 8, 11 cooling device, 12 D Date, setting, 45 E el

Pagina 63 - A5 Language cross reference

Brookfield Engineering Labs., Inc. Page 7 M/02-212 R/S Rheometer main instrument (minimum configuration) O K S T PowerMain-Menue - Run Sin

Pagina 64 - German menue system of RC20

Brookfield Engineering Labs., Inc. Page 8 M/02-212 II.2 Measuring Devices Measuring devices are not included in the main delivery volume of R

Pagina 65

Brookfield Engineering Labs., Inc. Page 9 M/02-212 III. Instrument Installation In this chapter you will know how to prepare your R/S Rheomet

Commenti su questo manuale

Nessun commento